Night Track Work

Via WMATA.com as of 11/13/2017 11 AM Eastern.

For Monday, November 13, 2017 Night



Red Line

Weeknight single tracking 9 PM to closing – Medical Center to Grosvenor for leak mitigation pilot. Trains every 20-25 minutes. (November 13 – November 22)



Orange Line

Weeknight single tracking 10 PM to closing – Foggy Bottom to Clarendon for power cable installation. Trains every 20-25 minutes. (November 13 – November 16)



Silver Line

Trains operate between Wiehle-Reston East and Ballston only 9:30 PM to closing. (November 13 – November 16)



Blue Line

Weeknight single tracking 10 PM to closing – Foggy Bottom to Arlington Cemetery for power cable installation. Trains every 20-25 minutes. (November 13 – November 16)



Yellow Line and Green Line

Weeknight single tracking 10 PM to closing – U Street to Georgia Avenue-Petworth for rail fastener renewal and joint elimination. Trains ever 20-25 minutes. (November 13 – November 16)

*NOTE: This may not be a complete listing of scheduled track work. Always check with WMATA.